Based on standard design developed during technology development phase (1997~2015), both KAERI and K.A.CARE are performing the Pre-Project Engineering (PPE)project jointly for three years to establish knowledge infrastructure in various fields of SMART technology during joint development phase.
During commercialization phase following three years of PPE, two FOAK (First-of-A-Kind) SMART plants are to be constructed in Saudi Arabia for around five years by obtaining construction permit and to be operated under operation license. The construction of two FOAK SMART plants are to be conducted by SMART Power Company.
Technology Development
ROK
SMART Development
SMART Standard DesignTechnology Validation & LicensingSefety Enhancement for Post Fukushima Action Plan
Joint Development
ROK & KSA
Pre-Project Engineering
FOAK Engineering DesignHCB on K.A.CARE Experts Prepare PSAR, Vendor Survey